The project
The newly built school building village Dietlikon consists of two full floors above ground and a basement at the southern end. The school building provides space for six elementary classrooms with the necessary material and teacher rooms. In addition, space has been created on the upper floor for the municipal library, which has a separate entrance at the southern end of the building.
The construction method
The entire building was planned as a timber frame construction. The staircases, on the other hand, are of steel construction. A special feature is certainly the canopy facing west, which cantilevers up to five meters.
Construction Data
- Construction timber 220 m3
Services of Timbatec
- SIA phase 31 preliminary project
- Cost estimate
- SIA Phase 32 Construction project
- Structural analysis and design
- SIA Phase 41 Tendering and comparison of offers
- SIA Phase 51 Implementation project
- Works planning 3D and 2D
- Site supervision and site inspections
Architect
Baumberger & Stegmeier AG
8004 Zurich
Timber construction contractor
Hector Egger Holzbau AG
4900 Langenthal