New construction warehouse Jungheinrich AG, Hirschthal, Schöftland

2009

New storage resources were needed at the Jungheinrich company site in Hirschthal. To achieve this, a warehouse with a large forecourt roof in wood was planned.

Facts and images
Construction Data
Involved
Exterior view sheet metal dress 2
Exterior view sheet metal dress 2
Interior view carcass
Interior view carcass
Interior view
Interior view
3D display
3D display
Transverse compression reinforcement with steel U-section, secondary supporting structure on bearing battens
Transverse compression reinforcement with steel U-section, secondary supporting structure on bearing battens

The project
The initial idea was to build a steel hall in the style of the main building. The high price of steel contributed to the search for an alternative, and so the client came up with wood as a building material. The lower costs were convincing - and the case showed that wooden halls can economically compete with steel structures.

The construction method
Twin girders made of glulam were chosen as the main girders, the girder dimension was 880 x 220 mm. The secondary structure consisted of ribbed slabs, the ribs made of glulam were glued above grade, rib dimension 320/80 mm, thickness of the three-layer slabs 42 mm. Wind bracing was provided by Swiss-Gewi bars arranged diagonally, with loads transferred directly to the foundations. Sandwich panels (d= 100mm) were used as external wall cladding.

Construction Data

- Total length 49.60 m

- Width 34.85 m

- Height 6.50

- Maximum span 13.90 m


Services of Timbatec

- SIA Phase 32 Construction project

- Statics and construction

- SIA Phase 51 Implementation project

- Technical site management and site inspections

Architect
BFB Architekten AG
4622 Egerkingen


Timber Contractor
Haudenschild Holzbau AG
4704 Niederbipp