Additional living space was created in the middle of the village of Wäldi with this replacement building in timber construction.

Facts and images
Construction Data
Involved

The project
The apartment building in Wäldi in the canton of Thurgau is a replacement for a barn that previously stood on the same site. The new four-storey building on Dorfstrasse now houses 8 spacious apartments of owner-occupied standard. The building is characterized by its spacious rooms. They are flooded with light, while the exposed wooden ceilings create a comfortable living environment.


The construction method
The basement with parking garage, cellar compartments, utility room and bicycle room as well as the staircase are made of reinforced concrete. Everything above ground level is made of wood. The exterior and interior walls of the first floor and other storeys are made of lightweight timber frame construction. The visible storey ceilings were constructed in solid timber using horizontal glulam.

The challenge
The rental apartments were planned according to the condominium standard. The high sound insulation requirements were met by weighting down the ceiling with chippings. The sound measurements carried out yielded extremely positive results.

Services of Timbatec

- SIA Phase 31 Preliminary project

- SIA Phase 32 Construction project

- SIA Phase 51 Implementation project

- SIA Phase 52 Execution

- Specialist planning building physics

- Technical planning fire protection

- Fire protection Quality assurance QSS2

- Technical site management and site inspections

Timberconstruction engineer
Timbatec Holzbauingenieure (Schweiz) AG Bern
3012 Bern

Timber construction
Krattiger Holzbau & Planung GmbH
9517 Mettlen

Client
Societas Immo AG
8564 Wäldi