The project
The Riburg housing cooperative has been revitalizing Basel's Hirzbrunnen district since 1945 and is one of the largest property owners there. It offers 390 attractive cooperative apartments at fair conditions. Many buildings are in urgent need of renovation, and renovation is not always a viable option. In two new replacement buildings planned by Burckhardt+Partner, 59 apartments will be created instead of the previous 36. Sustainable development is central to the housing cooperative. The use of wood as a building material is the logical consequence. And: timber construction is not more expensive than comparable buildings with other building materials. The timber construction allows a modular construction method.
The construction
The interior and exterior walls are built in timber frame construction. Since the timber engineering services were not provided by Timbatec, the floor slabs are constructed with horizontal glulam as a timber-concrete composite slab.
The challenge
Timbatec considered all installations in the works planning. Using the industry software Cadwork, we drew all timber components as a 3D model and supplemented this with information for production and processing. In this way, all components, including, for example, the hatchways, were produced in the factory ready for use.
Construction Data
- Glulam 680 m3
- OSB boards 2500 m2
Services of Timbatec
- Factory design 3D and 2D
Architect
Burckhardt+Partner AG 4002 Basel
Client
Wohnbaugenossenschaft Riburg 4058 Basel
Timber construction engineer
Pirmin Jung AG 3600 Thun
Timber construction
Stamm Bau AG 4144 Arlesheim
Construction management
Burckhardt+Partner AG 4002 Basel
Works planning
Timbatec Holzbauingenieure Schweiz AG3012 Bern