Increase Loepfe Brothers Ltd, Wetzikon

2018

The factory building of the internationally active Loepfe Brothers Ltd in Wetzikon ZH has reached the limit of its capacity. In the addition to the production hall, 2800 square meters of modern office space were created, thus ensuring the company's space requirements.

Facts and images
Construction Data
Involved
Exterior view
Exterior view
View inside
View inside
Aisle and view beams
Aisle and view beams
Entrance area with wooden ceiling
Entrance area with wooden ceiling
Interior view (Photography: Hector Egger Holzbau AG, Langenthal)
Interior view (Photography: Hector Egger Holzbau AG, Langenthal)

The project
The client's wish: as much freedom as possible in the design of the space and the possibility of easy conversion at a later date. Timbatec's solution: No load-bearing interior walls and only one row of columns in the middle of the building for maximum flexibility.

The construction
This was made possible by two high-performance wooden components: a beam made of BauBuche, which rests on the row of columns made of spruce glulam in the center of the building. The new, high-performance construction material allows a column spacing of 5 meters with a beam cross-section of only 400x300 millimeters. The second high-performance component is the box girder that forms the floor and roof elements. Thanks to the choice of an efficient static system, it was possible to achieve a low height of the elements.

The challenge
Said system requires that the elements extend from one external wall, through the beam in the middle, to the opposite external wall. The ceiling and roof elements reach a length of 16.9m. Thanks to the clever choice of structural systems and the targeted use of high-performance building materials, Timbatec succeeded in fulfilling the client's wishes and realizing a modern, economical timber construction.

Construction Data

- New office space 2800 m2

- Box beam ceiling 2400 m2

- Beam BauBuche 140 meters

- Support spruce


Services of Timbatec

- SIA Phase 31 Preliminary project

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 implementation project

- SIA Phase 52 Execution

- SIA Phase 53 Commissioning

- Statics and construction

- Technical planning for fire protection

- Fire protection quality assurance QSS2

Client
Loepfe Brothers Ltd.
8623 Wetzikon


Architect
Inova Partner AG
8623 Wetzikon


Timber construction engineer
Timbatec Holzbauingenieure (Schweiz) AG Zurich
8005 Zurich


Timber construction
Hector Egger Holzbau AG
4900 Langenthal


General contractor
Hirzel Generalunternehmung AG
8623 Wetzikon


Photography
Hector Egger Holzbau AG
4900 Langenthal