The project
With the new building for the extension of the school complex Allenlüften (municipality of Mühleberg) the winning project of the architectural office Planrand GmbH from the competition was realized. The building contains several classrooms, three kindergartens and a day school with the corresponding ancillary rooms.
The construction method
The simple new building with dimensions of approximately 20 x 56 m and a height of about 12.5 m was constructed as a reinforced concrete skeleton structure with a curtain-type wooden facade. In the three kindergartens there are also small gallery-like fixtures. The focus of attention for this building was the facade. A formwork was used which, thanks to the Biood pre-greying method from Schillinge Holz AG, has a uniform gray-silver appearance.
Construction Data
- 50 m3 Structural timber C24
- 765 m2 OSB boards
- 940 m2 Soft fiber boards
- 1220 m2 Facade formwork
Services of Timbatec
- SIA phase 31 preliminary project
- Cost estimate
- SIA Phase 32 Construction project
- Structural analysis and design
- SIA Phase 41 Tendering and comparison of offers
- SIA Phase 51 Implementation project
- Site supervision and site inspections
Client
Mühleberg Residents' Association
3203 Mühleberg
Architect
Planrand Architekten GmbH
3095 Spiegel b. Bern
Civil engineer
WAM Ingenieure + Planer AG
3005 Bern
Building physics
Weber Energy and Building Physics
3012 Bern
Timberconstruction
Beer Holzbau AG
3072 Ostermundigen
Timber Construction Engineers
Timbatec Holzbauingenieure Schweiz AG, Thun
3600 Thun